Major Infrastructure Boost for Tronica City (Ghaziabad): Two New Power Houses Approved with Rs 1409 Lakh Funding

Significant development in Tronica City as Rs 1409 lakh is sanctioned for building two new power houses. This move promises to resolve overloading issues, enhance industrial productivity, and support local entrepreneurs.

Major Infrastructure Boost for Tronica City (Ghaziabad): Two New Power Houses Approved with Rs 1409 Lakh Funding

GHAZIABAD, July 16, 2024 – In a major infrastructure development, the Uttar Pradesh State Industrial Development Corporation (UPIDA) has sanctioned Rs 1409.85 lakh for the construction of two new power houses in Tronica City. This initiative aims to address the persistent issue of overloading in the industrial area, promising improved power stability and enhanced productivity for local industries.

Power Houses Project in Tronica City Important Details:

  • Key Organization Involved: The UP State Industrial Development Corporation (UPIDA), led by CEO Mayur Maheshwari.
  • Project Approval and Funding: Approval and allocation of Rs 1409.85 lakh for constructing two new power houses.
  • Project Location: Tronica City, with one power house in Sector-1 and the other in Sector-D-1.
  • Timeline for Construction: Approval granted, with construction set to commence post-tender process within two months.
  • Purpose and Objectives: To eliminate power cuts and overloading issues, thereby boosting industrial output.
  • Implementation Strategy: Through the construction of 33/11 capacity power houses under the Atal Mission-3.0 scheme.

The recent approval by UPIDA marks a significant step forward for Tronica City’s industrial sector. The funds, allocated under the Atal Mission-3.0 initiative, will be used to construct two 33/11 capacity power houses. This development is crucial for mitigating the frequent power cuts and overloading that have plagued the area’s industrial units, hampering productivity.

Facts & Developments

The construction of the power houses will begin once the tender process is finalized in the next two months, according to UPIDA Executive Engineer Ashish Tomar. The project not only includes the building of power houses but also the installation of necessary power lines, ensuring a comprehensive solution to the existing power woes.

Currently, the lack of surplus power houses in the industrial area forces adjacent power houses to bear the load in case of any faults, exacerbating the overloading problem. The construction of these new power houses will provide much-needed relief, enabling uninterrupted power supply and fostering a conducive environment for industrial operations.

“With the approval of this significant amount, we are set to resolve the longstanding issues of power overloading and cuts in Tronica City. This will undoubtedly enhance the productivity and efficiency of our industrial units,” said UPIDA CEO Mayur Maheshwari.

Executive Engineer Ashish Tomar added, “The construction process will kickstart soon after the tender process. Entrepreneurs in sectors A-1 and D-1 have long awaited this development, and we are committed to meeting their needs.”

Tronica City, an industrial hub in Ghaziabad, has faced chronic power issues, affecting the output and operational efficiency of its numerous industrial units. The demand for additional power houses has been a persistent concern among local entrepreneurs.

Power Houses Construction

This infrastructural enhancement is poised to attract more investments into the region, potentially leading to economic growth and job creation. With reliable power supply, existing industries can expand their operations, and new businesses may find Tronica City a more viable location.

This initiative follows previous efforts under various schemes aimed at bolstering the industrial infrastructure of Uttar Pradesh. The Atal Mission-3.0 has been instrumental in funding such critical projects, reflecting the government’s commitment to supporting industrial growth.

UPIDA Announcements

UPIDA’s announcement has been met with optimism from the local business community, anticipating a significant reduction in operational disruptions once the new power houses are operational.

The successful implementation of this project will set a precedent for future infrastructure developments in other industrial areas facing similar challenges. It underscores the importance of robust infrastructure in driving industrial productivity and economic growth.

The approval of Rs 1409.85 lakh for the construction of two new power houses in Tronica City is a landmark development. This initiative is expected to resolve power overloading issues, improve industrial productivity, and foster a more conducive environment for business operations. As construction begins, the local community looks forward to the benefits this project will bring.

For more updates on this development, visit the UPIDA official website.

 

Samiksha is a veteran journalist with over twenty years of experience, having worked with top outlets like Click News, and India TV. Currently at therisingnews.com, Samiksha excels in crafting detailed, accurate, and engaging Education news articles. His work is known for its clarity and accessibility, making complex topics understandable for all readers, including fifth graders. Samiksha commitment to ethical journalism and quality content often sees his articles achieving top story status on platforms like Google News.